Construction Monitoring and Control of Cantilever Casting of Long Span Continuous Girder for 350 km/h High-Speed Railway

Shen Jin-gui

Open publisher page 0 citations

Abstract

The Tianjin-Qinhuangdao Passenger Dedicated Railway is designed as a high-speed railway of 350 km/h.The Xiawuji Canal Bridge on the railway spanning the Tangshan-Tianjin Expressway is a three-way prestressed concrete continuous box girder bridge with span arrangement(80.6+128+80.6) m and the girder of the bridge is constructed by the cantilever casting by form travelers.The software of Bridge Doctor 3.0 is used to set up the finite element calculation models,the geometric shape and stress of the girder are calculated and are monitored in real time in the construction process and the filed measurements of the girder are compared to the calculations.The results show that the construction monitoring and control of the girder have ensured the stability status of the girder in the construction and the final controlled geometric shape of the girder is satisfactory.

About this research paper

What this paper is about

The Tianjin-Qinhuangdao Passenger Dedicated Railway is designed as a high-speed railway of 350 km/h.The Xiawuji Canal Bridge on the railway spanning the Tangshan-Tianjin Expressway is a three-way prestressed concrete continuous box girder bridge with span arrangement(80.6+128+80.6) m and the girder of the bridge is constructed by the cantilever casting by form travelers.The software of Bridge Doctor 3.0 is used to set up the finite element calculation models,the geometric shape and stress of the girder are calculated and are monitored in real time in the construction process and the filed measurements of the girder are compared to the calculations.The results show that the construction monitoring and control of the girder have ensured the stability status of the girder in the construction and the final controlled geometric shape of the girder is satisfactory.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Tianjin-Qinhuangdao Passenger Dedicated Railway is designed as a high-speed railway of 350 km/h.The Xiawuji Canal Bridge on the railway spanning the Tangshan-Tianjin Expressway is a three-way prestressed concrete continuous box girder bridge with span arrangement(80.6+128+80.6) m and the girder of the bridge is constructed by the cantilever casting by form travelers.The software of Bridge Doctor 3.0 is used to set up the finite element calculation models,the geometric shape and stress of the girder are calculated and are monitored in real time in the construction process and the filed measurements of the girder are compared to the calculations.The results show that the construction monitoring and control of the girder have ensured the stability status of the girder in the construction and the final controlled geometric shape of the girder is satisfactory.

Key concepts: Structural engineering, Engineering, Cantilever, Bridge (graph theory), Girder, Box girder, Span (engineering), Finite element method

Related papers

Back to paper searchBrowse research topicsOriginal source
Construction Monitoring and Control of Cantilever Casting of Long Span Continuous Girder for 350 km/h High-Speed Railway — Research Paper | ScholarLens