2007Unpublished venueRequires access

Design and Construction of Long Span Continuous Steel Box Girder Bridge

MI Zhi-hui

Open publisher page 0 citations

Abstract

The continuous steel box girder bridge with span arrangement(44+79+44+37) m of the Interchange on the Middle Ring Road spanning the New Gonghe Road in Shanghai City is great in span length,large in construction scale and the deck of the bridge has variable width 30.8 ~ 44.1 m.To maintain the traffic flow on and under the existing New Gonghe Elevated Road in construction of the box girder bridge,the construction method of large steel block assembling and less scaffolding was applied.The geometric shape and internal forces of the girder bridge were adjusted in the construction and satisfactory results of both the stress and geometric shape of the girder after system transferring were achieved.In this paper,the principal design and construction features of the girder bridge are presented.

About this research paper

What this paper is about

The continuous steel box girder bridge with span arrangement(44+79+44+37) m of the Interchange on the Middle Ring Road spanning the New Gonghe Road in Shanghai City is great in span length,large in construction scale and the deck of the bridge has variable width 30.8 ~ 44.1 m.To maintain the traffic flow on and under the existing New Gonghe Elevated Road in construction of the box girder bridge,the construction method of large steel block assembling and less scaffolding was applied.The geometric shape and internal forces of the girder bridge were adjusted in the construction and satisfactory results of both the stress and geometric shape of the girder after system transferring were achieved.In this paper,the principal design and construction features of the girder bridge are presented.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The continuous steel box girder bridge with span arrangement(44+79+44+37) m of the Interchange on the Middle Ring Road spanning the New Gonghe Road in Shanghai City is great in span length,large in construction scale and the deck of the bridge has variable width 30.8 ~ 44.1 m.To maintain the traffic flow on and under the existing New Gonghe Elevated Road in construction of the box girder bridge,the construction method of large steel block assembling and less scaffolding was applied.The geometric shape and internal forces of the girder bridge were adjusted in the construction and satisfactory results of both the stress and geometric shape of the girder after system transferring were achieved.In this paper,the principal design and construction features of the girder bridge are presented.

Key concepts: Structural engineering, Box girder, Engineering, Deck, Bridge (graph theory), Span (engineering), Girder, Beam bridge

Related papers

Back to paper searchBrowse research topicsOriginal source
Design and Construction of Long Span Continuous Steel Box Girder Bridge — Research Paper | ScholarLens