A scheme on dewatering design in the pit for deep foundation pit of high-rise building
Bin Ren
Abstract
Bin Ren
Abstract
Taken the deep foundation pit of the high-rise building in Xi'an for example,and combined with the engineering geological conditions and hydrogeology conditions,it determines the design parameters of the foundation pit and puts forward some reasonable calculation method,design schemes and the main points for application of deep foundation pit dewatering to achieve the purpose of the design of precipitation and ensure the completion of the construction successfully.It can provide experiences for the similar projects.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Taken the deep foundation pit of the high-rise building in Xi'an for example,and combined with the engineering geological conditions and hydrogeology conditions,it determines the design parameters of the foundation pit and puts forward some reasonable calculation method,design schemes and the main points for application of deep foundation pit dewatering to achieve the purpose of the design of precipitation and ensure the completion of the construction successfully.It can provide experiences for the similar projects.
Key concepts: Dewatering, Foundation (evidence), Hydrogeology, High rise, Engineering, Civil engineering, Mining engineering, Geology