Summary on General Layout Design of Zhentouba I Hydropower Station
Pin Yang
Abstract
Pin Yang
Abstract
According to the hydrology and sediment conditions and the geographic and geologic condition at the dam site and the structural characteristics of hydraulic structures, and by considering hydraulic structure layout, flood discharge, construction condition and other factors, the general layout design of Zhentouba I Hydropower Station is introduced. The hydraulic structure consists of left-bank non-overflowing dam section, left-bank ladder fish way, riverbed powerhouse dam section, sewage gate,sluice gate and right-bank non-overflowing dam section. The general layout is compact and has obtained good economic benefit.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
According to the hydrology and sediment conditions and the geographic and geologic condition at the dam site and the structural characteristics of hydraulic structures, and by considering hydraulic structure layout, flood discharge, construction condition and other factors, the general layout design of Zhentouba I Hydropower Station is introduced. The hydraulic structure consists of left-bank non-overflowing dam section, left-bank ladder fish way, riverbed powerhouse dam section, sewage gate,sluice gate and right-bank non-overflowing dam section. The general layout is compact and has obtained good economic benefit.
Key concepts: Sluice, Hydropower, Section (typography), Hydraulic structure, Flood myth, Civil engineering, Hydrology (agriculture), Engineering