Tingzikou Hydropower Station is the only controlling project in main stream of Jialingjiang River,which is mainly for flood control,irrigation,urban and rural water supply and power generation,and gives consideration to navigation,sediment trapping as well.Lijiazui is selected as dam site through comprehensive comparison in the early period of design.In the engineering layout design,the dam axis of gravity dam and local materials dam and their layout are analyzed comparatively.The topography,geology,construction materials,layout,flood discharge and energy dissipation,construction,dispatching operation,environmental harmony and investment of the two dam types are taken into consideration.It is concluded that the gravity dam is superior in layout,flood discharge and energy dissipation and investment;therefore,gravity dam is recommended as the basic dam type of water-retaining structure.

About this research paper

What this paper is about

Tingzikou Hydropower Station is the only controlling project in main stream of Jialingjiang River,which is mainly for flood control,irrigation,urban and rural water supply and power generation,and gives consideration to navigation,sediment trapping as well.Lijiazui is selected as dam site through comprehensive comparison in the early period of design.In the engineering layout design,the dam axis of gravity dam and local materials dam and their layout are analyzed comparatively.The topography,geology,construction materials,layout,flood discharge and energy dissipation,construction,dispatching operation,environmental harmony and investment of the two dam types are taken into consideration.It is concluded that the gravity dam is superior in layout,flood discharge and energy dissipation and investment;therefore,gravity dam is recommended as the basic dam type of water-retaining structure.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Tingzikou Hydropower Station is the only controlling project in main stream of Jialingjiang River,which is mainly for flood control,irrigation,urban and rural water supply and power generation,and gives consideration to navigation,sediment trapping as well.Lijiazui is selected as dam site through comprehensive comparison in the early period of design.In the engineering layout design,the dam axis of gravity dam and local materials dam and their layout are analyzed comparatively.The topography,geology,construction materials,layout,flood discharge and energy dissipation,construction,dispatching operation,environmental harmony and investment of the two dam types are taken into consideration.It is concluded that the gravity dam is superior in layout,flood discharge and energy dissipation and investment;therefore,gravity dam is recommended as the basic dam type of water-retaining structure.

Key concepts: Hydropower, Flood control, Gravity dam, Civil engineering, Flood myth, Hydrology (agriculture), Environmental science, Dissipation