2009•Pearl RiverRequires access

Research on Hydrodynamic Control and Guide of Xixianghe River Mouth Water Environment Improvement in Shenzhen

WU Xiao-ming

Open publisher page 0 citations

Abstract

Before the construction of Dachanwan Jetty Wharf,the mouth of Xixianghe River faced the Lingdingyang Bay directly.The strong tidal dynamic power facilitated the water environment to keep clean around the mouth area.The construction of the Dachanwan Jetty Wharf enclosed the open bay into a semi-closed one.Xixianghe River mouth is located at the furthest part of the wharf and the water exchange with the open sea was largely reduced.The dramatic hydrodynamic variation tampered with the full dilution of the polluted water from upstream and the pollutants were accumulated within the mouth area as well as the harbor basin,worsening the water environment.This situation was aggravated day by day.The various hydrodynamic control and guide schemes are figured out to improve the water quality of Xixianghe River.

About this research paper

What this paper is about

Before the construction of Dachanwan Jetty Wharf,the mouth of Xixianghe River faced the Lingdingyang Bay directly.The strong tidal dynamic power facilitated the water environment to keep clean around the mouth area.The construction of the Dachanwan Jetty Wharf enclosed the open bay into a semi-closed one.Xixianghe River mouth is located at the furthest part of the wharf and the water exchange with the open sea was largely reduced.The dramatic hydrodynamic variation tampered with the full dilution of the polluted water from upstream and the pollutants were accumulated within the mouth area as well as the harbor basin,worsening the water environment.This situation was aggravated day by day.The various hydrodynamic control and guide schemes are figured out to improve the water quality of Xixianghe River.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Before the construction of Dachanwan Jetty Wharf,the mouth of Xixianghe River faced the Lingdingyang Bay directly.The strong tidal dynamic power facilitated the water environment to keep clean around the mouth area.The construction of the Dachanwan Jetty Wharf enclosed the open bay into a semi-closed one.Xixianghe River mouth is located at the furthest part of the wharf and the water exchange with the open sea was largely reduced.The dramatic hydrodynamic variation tampered with the full dilution of the polluted water from upstream and the pollutants were accumulated within the mouth area as well as the harbor basin,worsening the water environment.This situation was aggravated day by day.The various hydrodynamic control and guide schemes are figured out to improve the water quality of Xixianghe River.

Key concepts: Jetty, Wharf, River mouth, Bay, Environmental science, Water quality, Hydrology (agriculture), Open sea

Related papers

Back to paper searchBrowse research topicsOriginal source
Research on Hydrodynamic Control and Guide of Xixianghe River Mouth Water Environment Improvement in Shenzhen — Research Paper | ScholarLens