2011•Science Technology and EngineeringRequires access

The Research for Delaying the Bottom Water Coning in Horizontal Wells Application Step Screen Pipe

Qi Li

Open publisher page 1 citations

Abstract

When the horizontal well is applied to explore bottom water reservoir,oil wells will product water early and reduce the oil recovery without water,because bottom water cones to horizontal well too fast.The flow model inside wellbore of horizontal well has been developed to present a new method to delay bottom water coning through adopting step screen pipe to adjust fluid production in each division segment of the horizontal well.The method can enhance oil recovery without water through delaying the speed of bottom water coning.The actual oilfield calculation shows that the optimized arrangement step screen pipe can make the speed of bottom water coning in the horizontal identically,and delay the bottom water coning significantly.

About this research paper

What this paper is about

When the horizontal well is applied to explore bottom water reservoir,oil wells will product water early and reduce the oil recovery without water,because bottom water cones to horizontal well too fast.The flow model inside wellbore of horizontal well has been developed to present a new method to delay bottom water coning through adopting step screen pipe to adjust fluid production in each division segment of the horizontal well.The method can enhance oil recovery without water through delaying the speed of bottom water coning.The actual oilfield calculation shows that the optimized arrangement step screen pipe can make the speed of bottom water coning in the horizontal identically,and delay the bottom water coning significantly.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

When the horizontal well is applied to explore bottom water reservoir,oil wells will product water early and reduce the oil recovery without water,because bottom water cones to horizontal well too fast.The flow model inside wellbore of horizontal well has been developed to present a new method to delay bottom water coning through adopting step screen pipe to adjust fluid production in each division segment of the horizontal well.The method can enhance oil recovery without water through delaying the speed of bottom water coning.The actual oilfield calculation shows that the optimized arrangement step screen pipe can make the speed of bottom water coning in the horizontal identically,and delay the bottom water coning significantly.

Key concepts: Bottom water, Petroleum engineering, Directional drilling, Water cut, Wellbore, Flow (mathematics), Geology, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
The Research for Delaying the Bottom Water Coning in Horizontal Wells Application Step Screen Pipe — Research Paper | ScholarLens