2013•Advanced materials researchOpen access

The Research for Delaying the Bottom Water Coning in Horizontal Wells Application Balance Screen Pipe

Wu Yi Shan, Xue Zhang

Open full text 3 citations

Abstract

When horizontal wells are used to exploit reservoir with bottom water, oil wells water breakthrough prematurely due to water coning, water-free oil recovery is reduced. The reason of the formation of horizontal well water cone is analyzed. Then analysis of the mechanism using balanced screen pipe to inhibit bottom water coning in horizontal well is completed. According to the existing screen pipe size, screen configuration is optimized. Horizontal section pressure distribution is controlled by the balanced screen pipe, and then flow of horizontal well sections is adjusted. Bottom water coning speed of all well sections is controlled. An example is calculated by the software which established and the result shows that optimization method can improve water-free oil recovery.

About this research paper

What this paper is about

When horizontal wells are used to exploit reservoir with bottom water, oil wells water breakthrough prematurely due to water coning, water-free oil recovery is reduced. The reason of the formation of horizontal well water cone is analyzed. Then analysis of the mechanism using balanced screen pipe to inhibit bottom water coning in horizontal well is completed. According to the existing screen pipe size, screen configuration is optimized. Horizontal section pressure distribution is controlled by the balanced screen pipe, and then flow of horizontal well sections is adjusted. Bottom water coning speed of all well sections is controlled. An example is calculated by the software which established and the result shows that optimization method can improve water-free oil recovery.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

When horizontal wells are used to exploit reservoir with bottom water, oil wells water breakthrough prematurely due to water coning, water-free oil recovery is reduced. The reason of the formation of horizontal well water cone is analyzed. Then analysis of the mechanism using balanced screen pipe to inhibit bottom water coning in horizontal well is completed. According to the existing screen pipe size, screen configuration is optimized. Horizontal section pressure distribution is controlled by the balanced screen pipe, and then flow of horizontal well sections is adjusted. Bottom water coning speed of all well sections is controlled. An example is calculated by the software which established and the result shows that optimization method can improve water-free oil recovery.

Key concepts: Bottom water, Petroleum engineering, Water cut, Flow (mathematics), Water flow, Engineering, Geology, Marine engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
The Research for Delaying the Bottom Water Coning in Horizontal Wells Application Balance Screen Pipe — Research Paper | ScholarLens