Slip model construction technology of thin-walled hollow pier on Sigou Bridge in Xinzhou

HU Jun-fe

Open publisher page 0 citations

Abstract

According to design features of Sigou Bridge,duration and difficulty degree of construction technology,it determines to adopt new geochronology-upgrading derrick hydraulic slide model to construct on No.2 pier,and discusses slip model construction technology of thin-walled hollow pier,in order to promote the application of slip model construction technology.

About this research paper

What this paper is about

According to design features of Sigou Bridge,duration and difficulty degree of construction technology,it determines to adopt new geochronology-upgrading derrick hydraulic slide model to construct on No.2 pier,and discusses slip model construction technology of thin-walled hollow pier,in order to promote the application of slip model construction technology.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

According to design features of Sigou Bridge,duration and difficulty degree of construction technology,it determines to adopt new geochronology-upgrading derrick hydraulic slide model to construct on No.2 pier,and discusses slip model construction technology of thin-walled hollow pier,in order to promote the application of slip model construction technology.

Key concepts: Pier, Engineering, Slip (aerodynamics), Structural engineering, Geotechnical engineering, Civil engineering, Geology, Aerospace engineering