Slip form Construction of 48 m High-pier of Goucanggou Large Bridge
Jin Hui Li
Abstract
Jin Hui Li
Abstract
The paper introduced the conditions of high pier slip form construction,slip from mould set up,reinforcement manufacturing,concrete pouring etc.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The paper introduced the conditions of high pier slip form construction,slip from mould set up,reinforcement manufacturing,concrete pouring etc.
Key concepts: Pier, Bridge (graph theory), Slip (aerodynamics), Geology, Structural engineering, Forensic engineering, Engineering, Geotechnical engineering