Slip form Construction of 48 m High-pier of Goucanggou Large Bridge

Jin Hui Li

Open publisher page 0 citations

Abstract

The paper introduced the conditions of high pier slip form construction,slip from mould set up,reinforcement manufacturing,concrete pouring etc.

About this research paper

What this paper is about

The paper introduced the conditions of high pier slip form construction,slip from mould set up,reinforcement manufacturing,concrete pouring etc.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The paper introduced the conditions of high pier slip form construction,slip from mould set up,reinforcement manufacturing,concrete pouring etc.

Key concepts: Pier, Bridge (graph theory), Slip (aerodynamics), Geology, Structural engineering, Forensic engineering, Engineering, Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Slip form Construction of 48 m High-pier of Goucanggou Large Bridge — Research Paper | ScholarLens