Causes analysis and treatment of extra-long Yunzhongshan tunnel collapse
Yong Liu
Abstract
Yong Liu
Abstract
This paper introduces the whole process of arch top instability and collapse at left railway line LK43+642~LK43+660 of extra-long Yunzhongshan tunnel,the paper analyzes the collapse causes from three aspects of geological causes,leakages and erosion,and construction factors and inaccurate preliminary geology prediction and so on.Combining with specific engineering conditions,it puts forward safe and reliable collapse processing measures.In the process of treatment,it neither influences the security of existing railway line nor fail to complete the construction at collapse section.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This paper introduces the whole process of arch top instability and collapse at left railway line LK43+642~LK43+660 of extra-long Yunzhongshan tunnel,the paper analyzes the collapse causes from three aspects of geological causes,leakages and erosion,and construction factors and inaccurate preliminary geology prediction and so on.Combining with specific engineering conditions,it puts forward safe and reliable collapse processing measures.In the process of treatment,it neither influences the security of existing railway line nor fail to complete the construction at collapse section.
Key concepts: Arch, Forensic engineering, Engineering, Process (computing), Section (typography), Geology, Computer science, Civil engineering