2011•Shanxi ArchitectureRequires access

Fast and economic methods used to processing tunnel collapse owing to vertical fault

Jia Zhang

Open publisher page 0 citations

Abstract

This paper analyzes the Dahuyu tunnel arch vertical collapse accident,formulates the processing principle of adapting to local conditions,fast and security,economic long-lasting,and proposes fast and economic collapse treatment method,which has provided experience for similar collapse treatment.

About this research paper

What this paper is about

This paper analyzes the Dahuyu tunnel arch vertical collapse accident,formulates the processing principle of adapting to local conditions,fast and security,economic long-lasting,and proposes fast and economic collapse treatment method,which has provided experience for similar collapse treatment.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper analyzes the Dahuyu tunnel arch vertical collapse accident,formulates the processing principle of adapting to local conditions,fast and security,economic long-lasting,and proposes fast and economic collapse treatment method,which has provided experience for similar collapse treatment.

Key concepts: Arch, Economic collapse, Progressive collapse, Forensic engineering, Geology, Computer science, Engineering, Structural engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Fast and economic methods used to processing tunnel collapse owing to vertical fault — Research Paper | ScholarLens