On quality control of TBM construction scheme
LV Hai-min
Abstract
LV Hai-min
Abstract
The paper mainly introduces the main quality shortage by adopting TBM construction of drawing-water tunnel of the hydropower station,has the brief analysis of the factors for the quality shortages,and points out the controlling measures for the TBM construction quality,so as to ensure the tunnel general quality of the TBM construction process.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The paper mainly introduces the main quality shortage by adopting TBM construction of drawing-water tunnel of the hydropower station,has the brief analysis of the factors for the quality shortages,and points out the controlling measures for the TBM construction quality,so as to ensure the tunnel general quality of the TBM construction process.
Key concepts: Quality (philosophy), Economic shortage, Hydropower, Control (management), Engineering, Process (computing), Scheme (mathematics), Civil engineering