2010Shanxi ArchitectureRequires access

On quality control of TBM construction scheme

LV Hai-min

Open publisher page 0 citations

Abstract

The paper mainly introduces the main quality shortage by adopting TBM construction of drawing-water tunnel of the hydropower station,has the brief analysis of the factors for the quality shortages,and points out the controlling measures for the TBM construction quality,so as to ensure the tunnel general quality of the TBM construction process.

About this research paper

What this paper is about

The paper mainly introduces the main quality shortage by adopting TBM construction of drawing-water tunnel of the hydropower station,has the brief analysis of the factors for the quality shortages,and points out the controlling measures for the TBM construction quality,so as to ensure the tunnel general quality of the TBM construction process.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The paper mainly introduces the main quality shortage by adopting TBM construction of drawing-water tunnel of the hydropower station,has the brief analysis of the factors for the quality shortages,and points out the controlling measures for the TBM construction quality,so as to ensure the tunnel general quality of the TBM construction process.

Key concepts: Quality (philosophy), Economic shortage, Hydropower, Control (management), Engineering, Process (computing), Scheme (mathematics), Civil engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
On quality control of TBM construction scheme — Research Paper | ScholarLens