The effect of stable oil production and control water content and technics bulwark in Sanzankuruk oil field
Naiming Guo
Abstract
Naiming Guo
Abstract
From the year of 2004,the oil production in Sanzankuruk oil field overrun 200 thousands tons over 3 years and the composite water cut move upward from 85.2% to 86.8% present.It mainly attribute the success to the work of remaining oil study,the data of PDK logging applying and improve water shutoff technics.We will summarize the water shutoff technics and its effectiveness in high dig angle structure-lithologic deposit.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
From the year of 2004,the oil production in Sanzankuruk oil field overrun 200 thousands tons over 3 years and the composite water cut move upward from 85.2% to 86.8% present.It mainly attribute the success to the work of remaining oil study,the data of PDK logging applying and improve water shutoff technics.We will summarize the water shutoff technics and its effectiveness in high dig angle structure-lithologic deposit.
Key concepts: Petroleum engineering, Oil field, Oil production, Water cut, Production (economics), Engineering, Environmental science, Economics