2010•Journal of Petrochemical UniversitiesRequires access

The Application of New Water Shutoff Technology on Gaoshangpu Oilfield Swallow Area

Yan Zhou

Open publisher page 0 citations

Abstract

The shallow reservoir of Gaoshangpu Oilfield was the boundary,natural energy driven reservoir.It had sufficient energy,and interval layer between oil and water layers were thinner.To control basal or bottom water plugging,prolong water-free or low water cut oil production period and keep basal or bottom water flowing evenly,the selective chemical water shutoff technology indoor evaluation test and field pilot test were carried out.The indoor evaluation test indicates the dimensionless ratio of water and oil shutoff is 5.25;the effect of pilot test application of well G104-5P35 is obvious and continuous.The amount of decreasing produced water is 68 000 cubic meter and the amount of increasing oil production is 705 tons,and the amount of water cut decreasing is four percent.

About this research paper

What this paper is about

The shallow reservoir of Gaoshangpu Oilfield was the boundary,natural energy driven reservoir.It had sufficient energy,and interval layer between oil and water layers were thinner.To control basal or bottom water plugging,prolong water-free or low water cut oil production period and keep basal or bottom water flowing evenly,the selective chemical water shutoff technology indoor evaluation test and field pilot test were carried out.The indoor evaluation test indicates the dimensionless ratio of water and oil shutoff is 5.25;the effect of pilot test application of well G104-5P35 is obvious and continuous.The amount of decreasing produced water is 68 000 cubic meter and the amount of increasing oil production is 705 tons,and the amount of water cut decreasing is four percent.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The shallow reservoir of Gaoshangpu Oilfield was the boundary,natural energy driven reservoir.It had sufficient energy,and interval layer between oil and water layers were thinner.To control basal or bottom water plugging,prolong water-free or low water cut oil production period and keep basal or bottom water flowing evenly,the selective chemical water shutoff technology indoor evaluation test and field pilot test were carried out.The indoor evaluation test indicates the dimensionless ratio of water and oil shutoff is 5.25;the effect of pilot test application of well G104-5P35 is obvious and continuous.The amount of decreasing produced water is 68 000 cubic meter and the amount of increasing oil production is 705 tons,and the amount of water cut decreasing is four percent.

Key concepts: Oil production, Water cut, Petroleum engineering, Environmental science, Water injection (oil production), Oil field, Dimensionless quantity, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
The Application of New Water Shutoff Technology on Gaoshangpu Oilfield Swallow Area — Research Paper | ScholarLens