2006Engineering Journal of Wuhan UniversityRequires access

Impact of construction of reservoirs at Jinsha River on sediment deposition at Chongqing Reach

Gan Fuwan

Open publisher page 0 citations

Abstract

The impacts on the sediment deposition at Chongqing Reach before and after the construction of the reservoirs at the Jinsha River are studied by two-dimensional flow and sediment model. The results show that under the condition of no reservoirs at the Jinsha River, the accumulated sediment deposition will increase in the initial using period of the Three Gorges Reservoir; and navigation problems maybe occur in local shoals with the increase of the using time of the reservoir. Under the condition of construction of reservoirs at the Jinsha River, erosion will be occurred at the main channel of Chongqing Reach; but the sediment deposition at Jinshaqi shoal is similar with that under the condition of no reservoirs.

About this research paper

What this paper is about

The impacts on the sediment deposition at Chongqing Reach before and after the construction of the reservoirs at the Jinsha River are studied by two-dimensional flow and sediment model. The results show that under the condition of no reservoirs at the Jinsha River, the accumulated sediment deposition will increase in the initial using period of the Three Gorges Reservoir; and navigation problems maybe occur in local shoals with the increase of the using time of the reservoir. Under the condition of construction of reservoirs at the Jinsha River, erosion will be occurred at the main channel of Chongqing Reach; but the sediment deposition at Jinshaqi shoal is similar with that under the condition of no reservoirs.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The impacts on the sediment deposition at Chongqing Reach before and after the construction of the reservoirs at the Jinsha River are studied by two-dimensional flow and sediment model. The results show that under the condition of no reservoirs at the Jinsha River, the accumulated sediment deposition will increase in the initial using period of the Three Gorges Reservoir; and navigation problems maybe occur in local shoals with the increase of the using time of the reservoir. Under the condition of construction of reservoirs at the Jinsha River, erosion will be occurred at the main channel of Chongqing Reach; but the sediment deposition at Jinshaqi shoal is similar with that under the condition of no reservoirs.

Key concepts: Shoal, Deposition (geology), Sediment, Three gorges, Erosion, Hydrology (agriculture), Geology, Channel (broadcasting)

Related papers

Back to paper searchBrowse research topicsOriginal source
Impact of construction of reservoirs at Jinsha River on sediment deposition at Chongqing Reach — Research Paper | ScholarLens