2012Port & Waterway EngineeringRequires access

Optimization of plan layout and navigable condition in water diversion project from the Yangtze River to the Hanjiang River

LI Jun-tao

Open publisher page 0 citations

Abstract

The plan layout and navigable condition in the water diversion project from the Yangtze River to the Hanjiang River are analyzed by a combination of the tidal current physical model test,remote-control self-propulsive ship model,mathematical model and maneuvering mathematical model.This paper expounds the navigation condition of the junction of the Yangtze River and the water diversion project,downstream channel of Longzhouyuan lock and navigable spans of Jingjiang dyke,analyzes the influential factors of the navigable flow condition in the design,and proposes the optimal layout scheme which satisfies the requirement of safe navigation through taking a variety of engineering measures to improve the navigable floe condition to counter the disadvantages of the design scheme.

About this research paper

What this paper is about

The plan layout and navigable condition in the water diversion project from the Yangtze River to the Hanjiang River are analyzed by a combination of the tidal current physical model test,remote-control self-propulsive ship model,mathematical model and maneuvering mathematical model.This paper expounds the navigation condition of the junction of the Yangtze River and the water diversion project,downstream channel of Longzhouyuan lock and navigable spans of Jingjiang dyke,analyzes the influential factors of the navigable flow condition in the design,and proposes the optimal layout scheme which satisfies the requirement of safe navigation through taking a variety of engineering measures to improve the navigable floe condition to counter the disadvantages of the design scheme.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The plan layout and navigable condition in the water diversion project from the Yangtze River to the Hanjiang River are analyzed by a combination of the tidal current physical model test,remote-control self-propulsive ship model,mathematical model and maneuvering mathematical model.This paper expounds the navigation condition of the junction of the Yangtze River and the water diversion project,downstream channel of Longzhouyuan lock and navigable spans of Jingjiang dyke,analyzes the influential factors of the navigable flow condition in the design,and proposes the optimal layout scheme which satisfies the requirement of safe navigation through taking a variety of engineering measures to improve the navigable floe condition to counter the disadvantages of the design scheme.

Key concepts: Water diversion, Yangtze river, Lock (firearm), Channel (broadcasting), Plan (archaeology), River regime, Civil engineering, Environmental science

Related papers

Back to paper searchBrowse research topicsOriginal source
Optimization of plan layout and navigable condition in water diversion project from the Yangtze River to the Hanjiang River — Research Paper | ScholarLens