2007•Shanxi ArchitectureRequires access

On dewatering construction technology of foundation pit in Shaliu station

MA Guo-qian

Open publisher page 0 citations

Abstract

Combined with practical engineering of deep foundation pit in Shaliu station of metro 2nd line in Tianjin,the author analyzes the problems needed to be solved by dewatering engineering at the stage of construction,carries out qualitative analysis of dewatering design as total water yield of foundation drainage and the number of dewatering well,and illustrates the problems should be noticed in construction,which has a certain referential value.

About this research paper

What this paper is about

Combined with practical engineering of deep foundation pit in Shaliu station of metro 2nd line in Tianjin,the author analyzes the problems needed to be solved by dewatering engineering at the stage of construction,carries out qualitative analysis of dewatering design as total water yield of foundation drainage and the number of dewatering well,and illustrates the problems should be noticed in construction,which has a certain referential value.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Combined with practical engineering of deep foundation pit in Shaliu station of metro 2nd line in Tianjin,the author analyzes the problems needed to be solved by dewatering engineering at the stage of construction,carries out qualitative analysis of dewatering design as total water yield of foundation drainage and the number of dewatering well,and illustrates the problems should be noticed in construction,which has a certain referential value.

Key concepts: Dewatering, Foundation (evidence), Engineering, Drainage, Civil engineering, Geotechnical engineering, Geography, Archaeology

Related papers

Back to paper searchBrowse research topicsOriginal source
On dewatering construction technology of foundation pit in Shaliu station — Research Paper | ScholarLens