Design and Construction of Deep Foundation Pit Dewatering
Cheng Xue-jun
Abstract
Cheng Xue-jun
Abstract
In this article,authors analyze something about the design and construction of deep foundation pit dewatering,such as the interval time between foundation pit dewatering construction and investigation,the effect of ambient foundation pits water level,and dewatering dynamic control,etc.At last,some matters for dewatering design and construction needing attention are presented.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In this article,authors analyze something about the design and construction of deep foundation pit dewatering,such as the interval time between foundation pit dewatering construction and investigation,the effect of ambient foundation pits water level,and dewatering dynamic control,etc.At last,some matters for dewatering design and construction needing attention are presented.
Key concepts: Dewatering, Foundation (evidence), Engineering, Civil engineering, Geotechnical engineering, Construction engineering, Law, Political science