2005•Petroleum Geology & Oilfield Development in DaqingRequires access

Method of calculating relative permeability curve by production data

Shangbin Liang, Cnopec Xinxing

Open publisher page 2 citations

Abstract

This paper presents a method of calculating relative permeability in an oil reservoir with the help of production data-water cut.The method can reflect the actual production performance of oil field,thus the obtained curve can have certain representativeness. In addition,the method can not only overcome the limit resulted from pilot test,but also gain the ratio of relative permeability and its value.On the basis of the above, it can also predict oilfield development indexes and evaluate the development effects.

About this research paper

What this paper is about

This paper presents a method of calculating relative permeability in an oil reservoir with the help of production data-water cut.The method can reflect the actual production performance of oil field,thus the obtained curve can have certain representativeness. In addition,the method can not only overcome the limit resulted from pilot test,but also gain the ratio of relative permeability and its value.On the basis of the above, it can also predict oilfield development indexes and evaluate the development effects.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper presents a method of calculating relative permeability in an oil reservoir with the help of production data-water cut.The method can reflect the actual production performance of oil field,thus the obtained curve can have certain representativeness. In addition,the method can not only overcome the limit resulted from pilot test,but also gain the ratio of relative permeability and its value.On the basis of the above, it can also predict oilfield development indexes and evaluate the development effects.

Key concepts: Relative permeability, Petroleum engineering, Water cut, Permeability (electromagnetism), Representativeness heuristic, Oil field, Oil production, Production (economics)

Related papers

Back to paper searchBrowse research topicsOriginal source
Method of calculating relative permeability curve by production data — Research Paper | ScholarLens