Analysis on Monitoring Results of Comprehensive Treatment of High Forebay Slope,Hujiaya Hydropower Project
Zeyang Zhou
Abstract
Zeyang Zhou
Abstract
Jointly acted by Fault F7 and its affected zone,the high forebay slope of Hujiaya Hydropower Project on the Bailong River in Zhouqu County,Gansu Province continues collapsing and falling block stones during the slope construction,resulting in instability of the slope angle at bottom of the slope.This seriously affects the safety of the forebay slope in construction and operation periods.In design,not only rational design scheme but also feasible slope monitoring scheme are planned and raised.After completion of the treatment,the safety monitoring data is analyzed.The rationality of the slope treatment scheme and the safety assurance during operation are satisfied.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Jointly acted by Fault F7 and its affected zone,the high forebay slope of Hujiaya Hydropower Project on the Bailong River in Zhouqu County,Gansu Province continues collapsing and falling block stones during the slope construction,resulting in instability of the slope angle at bottom of the slope.This seriously affects the safety of the forebay slope in construction and operation periods.In design,not only rational design scheme but also feasible slope monitoring scheme are planned and raised.After completion of the treatment,the safety monitoring data is analyzed.The rationality of the slope treatment scheme and the safety assurance during operation are satisfied.
Key concepts: Hydropower, Safety monitoring, Slope failure, Environmental science, Slope stability, Engineering, Geotechnical engineering, Biotechnology