2012•Northwest HydropowerRequires access

Analysis on Monitoring Results of Comprehensive Treatment of High Forebay Slope,Hujiaya Hydropower Project

Zeyang Zhou

Open publisher page 0 citations

Abstract

Jointly acted by Fault F7 and its affected zone,the high forebay slope of Hujiaya Hydropower Project on the Bailong River in Zhouqu County,Gansu Province continues collapsing and falling block stones during the slope construction,resulting in instability of the slope angle at bottom of the slope.This seriously affects the safety of the forebay slope in construction and operation periods.In design,not only rational design scheme but also feasible slope monitoring scheme are planned and raised.After completion of the treatment,the safety monitoring data is analyzed.The rationality of the slope treatment scheme and the safety assurance during operation are satisfied.

About this research paper

What this paper is about

Jointly acted by Fault F7 and its affected zone,the high forebay slope of Hujiaya Hydropower Project on the Bailong River in Zhouqu County,Gansu Province continues collapsing and falling block stones during the slope construction,resulting in instability of the slope angle at bottom of the slope.This seriously affects the safety of the forebay slope in construction and operation periods.In design,not only rational design scheme but also feasible slope monitoring scheme are planned and raised.After completion of the treatment,the safety monitoring data is analyzed.The rationality of the slope treatment scheme and the safety assurance during operation are satisfied.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Jointly acted by Fault F7 and its affected zone,the high forebay slope of Hujiaya Hydropower Project on the Bailong River in Zhouqu County,Gansu Province continues collapsing and falling block stones during the slope construction,resulting in instability of the slope angle at bottom of the slope.This seriously affects the safety of the forebay slope in construction and operation periods.In design,not only rational design scheme but also feasible slope monitoring scheme are planned and raised.After completion of the treatment,the safety monitoring data is analyzed.The rationality of the slope treatment scheme and the safety assurance during operation are satisfied.

Key concepts: Hydropower, Safety monitoring, Slope failure, Environmental science, Slope stability, Engineering, Geotechnical engineering, Biotechnology

Related papers

Back to paper searchBrowse research topicsOriginal source
Analysis on Monitoring Results of Comprehensive Treatment of High Forebay Slope,Hujiaya Hydropower Project — Research Paper | ScholarLens