Influences of Residual Cofferdam of Diversion Tunnel of Huangdeng Hydroproject on the River Closure

DU Xiao-fan

Open publisher page 1 citations

Abstract

The influences of residual cofferdam at the inlet and outlet of diversion tunnel on the river closure were investigated through model test with Huangdeng hydropower station as a case study.The influences were analyzed in terms of upstream water-level fluctuation,hydraulic parameters variation during the river closure,and loss of dumped ripraps.The result indicates that the residual cofferdam of diversion tunnel increases the difficulty of river closure.The residual cofferdam at the inlet of the diversion tunnel has bigger influence on discharge capacity than that at the outlet.And the influence on the discharge capacity decreases when the discharge increases.It's concluded that the cofferdam at the inlet of diversion tunnel should be demolished to the design elevation as much as possible.

About this research paper

What this paper is about

The influences of residual cofferdam at the inlet and outlet of diversion tunnel on the river closure were investigated through model test with Huangdeng hydropower station as a case study.The influences were analyzed in terms of upstream water-level fluctuation,hydraulic parameters variation during the river closure,and loss of dumped ripraps.The result indicates that the residual cofferdam of diversion tunnel increases the difficulty of river closure.The residual cofferdam at the inlet of the diversion tunnel has bigger influence on discharge capacity than that at the outlet.And the influence on the discharge capacity decreases when the discharge increases.It's concluded that the cofferdam at the inlet of diversion tunnel should be demolished to the design elevation as much as possible.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The influences of residual cofferdam at the inlet and outlet of diversion tunnel on the river closure were investigated through model test with Huangdeng hydropower station as a case study.The influences were analyzed in terms of upstream water-level fluctuation,hydraulic parameters variation during the river closure,and loss of dumped ripraps.The result indicates that the residual cofferdam of diversion tunnel increases the difficulty of river closure.The residual cofferdam at the inlet of the diversion tunnel has bigger influence on discharge capacity than that at the outlet.And the influence on the discharge capacity decreases when the discharge increases.It's concluded that the cofferdam at the inlet of diversion tunnel should be demolished to the design elevation as much as possible.

Key concepts: Cofferdam, Inlet, Residual, Closure (psychology), Hydropower, Geotechnical engineering, Water discharge, Environmental science

Related papers

Back to paper searchBrowse research topicsOriginal source
Influences of Residual Cofferdam of Diversion Tunnel of Huangdeng Hydroproject on the River Closure — Research Paper | ScholarLens