2021Ain Shams Engineering JournalOpen access

Effect of residual cofferdam at the diversion tunnel inlet on the index of river closure and the dumped materials: A Case study

Dengsong Li, Yang Kechen, Zhou Shunwen

Open full text 5 citations

Abstract

The cofferdam built at the inlet of the diversion tunnel may be left due to incomplete blasting demolition, which affects the river closure. Several indexes have been used to evaluate the difficulty of river closure, but all indexes suffer from their limitations in use. Thus, it is more useful to combination multiple indexes to analyze the impact of residual cofferdam. Taking the river closure project of a Hydropower Station in southwest China as an example, the influence of the residual cofferdam heights on the river closure was studied by experiments. The discharge of river closure is 590 m3/s and 758 m3/s. In this paper, the results of studies on a 1:50 scale hydraulic model based on the Froude similitude relationships are presented. The test results show that the discharge capacity of the diversion tunnel is reduced by 27.2% at most when this height is more than 2 m. The residual height mainly affects the maximum of stream energy with unit width, which increase by more than 50% at most compare to Non-existent residual cofferdam. However, the final drop, max-velocity along the gap axis, the local scour of riverbed and the flow pattern of the gap are basically not affected. In addition, with the height increase, the bank collapse is intensified, and the amount of dumped material with medium size increases, especially when it reaches 4 m, the large or Extra-large size stones begin to be dumped. Based on the comprehensive evaluation of multiple indexes and the type of dumped material, it is shown that the residual cofferdam height more than a certain value, the value is 2 m for the case study, will significantly increase the river closure difficult.

Open-access reader

About this research paper

What this paper is about

The cofferdam built at the inlet of the diversion tunnel may be left due to incomplete blasting demolition, which affects the river closure. Several indexes have been used to evaluate the difficulty of river closure, but all indexes suffer from their limitations in use. Thus, it is more useful to combination multiple indexes to analyze the impact of residual cofferdam. Taking the river closure project of a Hydropower Station in southwest China as an example, the influence of the residual cofferdam heights on the river closure was studied by experiments. The discharge of river closure is 590 m3/s and 758 m3/s. In this paper, the results of studies on a 1:50 scale hydraulic model based on the Froude similitude relationships are presented. The test results show that the discharge capacity of the diversion tunnel is reduced by 27.2% at most when this height is more than 2 m. The residual height mainly affects the maximum of stream energy with unit width, which increase by more than 50% at most compare to Non-existent residual cofferdam. However, the final drop, max-velocity along the gap axis, the local scour of riverbed and the flow pattern of the gap are basically not affected. In addition, with the height increase, the bank collapse is intensified, and the amount of dumped material with medium size increases, especially when it reaches 4 m, the large or Extra-large size stones begin to be dumped. Based on the comprehensive evaluation of multiple indexes and the type of dumped material, it is shown that the residual cofferdam height more than a certain value, the value is 2 m for the case study, will significantly increase the river closure difficult.

Why it matters

OpenAlex reports 5 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The cofferdam built at the inlet of the diversion tunnel may be left due to incomplete blasting demolition, which affects the river closure. Several indexes have been used to evaluate the difficulty of river closure, but all indexes suffer from their limitations in use. Thus, it is more useful to combination multiple indexes to analyze the impact of residual cofferdam. Taking the river closure project of a Hydropower Station in southwest China as an example, the influence of the residual cofferdam heights on the river closure was studied by experiments. The discharge of river closure is 590 m3/s and 758 m3/s. In this paper, the results of studies on a 1:50 scale hydraulic model based on the Froude similitude relationships are presented. The test results show that the discharge capacity of the diversion tunnel is reduced by 27.2% at most when this height is more than 2 m. The residual height mainly affects the maximum of stream energy with unit width, which increase by more than 50% at most compare to Non-existent residual cofferdam. However, the final drop, max-velocity along the gap axis, the local scour of riverbed and the flow pattern of the gap are basically not affected. In addition, with the height increase, the bank collapse is intensified, and the amount of dumped material with medium size increases, especially when it reaches 4 m, the large or Extra-large size stones begin to be dumped. Based on the comprehensive evaluation of multiple indexes and the type of dumped material, it is shown that the residual cofferdam height more than a certain value, the value is 2 m for the case study, will significantly increase the river closure difficult.

Key concepts: Cofferdam, Froude number, Residual, Closure (psychology), Hydropower, Environmental science, Inlet, Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Effect of residual cofferdam at the diversion tunnel inlet on the index of river closure and the dumped materials: A Case study — Research Paper | ScholarLens