A study of optimal construction scheme of high concrete face rockfill dam in consideration of rockfill creep effect
Yan Sun-cun
Abstract
Yan Sun-cun
Abstract
Optimal construction scheme of high concrete face rockfill dam(CFRD) is studied taking into account creep deformation of rockfill.The results show that creep characteristic of rockfill influence on deformation of dam bedding node under different construction schemes.The zone by zone character of various materials of a rockfill dam decides objectively the necessary existence of an optimal scheme for the construction of filling ascension works.The maximum normal displacement of the facial slab is small in the filling.Scheme where the rock-filling body ascends uniformly and its distribution along the slab slope is also rather uniform,which is favourable to the harmony between the deformations of slab and pad layer beneath it.From the view of the majorized filling scheme,it is suggested that the rolling and compacting construction procedure producing uniform ascension of filling shall be used for high rockfill dams.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Optimal construction scheme of high concrete face rockfill dam(CFRD) is studied taking into account creep deformation of rockfill.The results show that creep characteristic of rockfill influence on deformation of dam bedding node under different construction schemes.The zone by zone character of various materials of a rockfill dam decides objectively the necessary existence of an optimal scheme for the construction of filling ascension works.The maximum normal displacement of the facial slab is small in the filling.Scheme where the rock-filling body ascends uniformly and its distribution along the slab slope is also rather uniform,which is favourable to the harmony between the deformations of slab and pad layer beneath it.From the view of the majorized filling scheme,it is suggested that the rolling and compacting construction procedure producing uniform ascension of filling shall be used for high rockfill dams.
Key concepts: Creep, Slab, Geotechnical engineering, Geology, Deformation (meteorology), Displacement (psychology), Bedding, Structural engineering