2010Northwest HydropowerRequires access

Discussion on face slab pouring time of high concrete face rockfill dam

XU Xiao-dong

Open publisher page 0 citations

Abstract

In order to avoid large or non-uniform deformation of rockfill after face slab placement,it is proposed to analyze and sort out the early monitoring data of rockfill filling,and compare the advantages and disadvantages of Duncan model,two-yield surface elastic-plastic model and Tsinghua non-linear K-G model applied in rockfill dams.Based on the measured data at early construction,the constitutive model reflecting actual status of rockfill in specific conditions is determined.In combination with genetic algorithm,the BP neural network is used to back calculate the optimal parameters of the model,then analyze and calculate the predicted rockfill settlement and deformation during construction.By analysis and comparison of the predicted settlement and deformation with the measured settlement and deformation of the completed rockfill,and taking the predicted settlement and deformation of rockfill for reference,the settlement period is rationally prepared in advance and face slab placement time is reasonably determined so as to prevent negative influence of large rockfill settlement and deformation on the face slabs and improve the stress and deformation of face slabs.

About this research paper

What this paper is about

In order to avoid large or non-uniform deformation of rockfill after face slab placement,it is proposed to analyze and sort out the early monitoring data of rockfill filling,and compare the advantages and disadvantages of Duncan model,two-yield surface elastic-plastic model and Tsinghua non-linear K-G model applied in rockfill dams.Based on the measured data at early construction,the constitutive model reflecting actual status of rockfill in specific conditions is determined.In combination with genetic algorithm,the BP neural network is used to back calculate the optimal parameters of the model,then analyze and calculate the predicted rockfill settlement and deformation during construction.By analysis and comparison of the predicted settlement and deformation with the measured settlement and deformation of the completed rockfill,and taking the predicted settlement and deformation of rockfill for reference,the settlement period is rationally prepared in advance and face slab placement time is reasonably determined so as to prevent negative influence of large rockfill settlement and deformation on the face slabs and improve the stress and deformation of face slabs.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In order to avoid large or non-uniform deformation of rockfill after face slab placement,it is proposed to analyze and sort out the early monitoring data of rockfill filling,and compare the advantages and disadvantages of Duncan model,two-yield surface elastic-plastic model and Tsinghua non-linear K-G model applied in rockfill dams.Based on the measured data at early construction,the constitutive model reflecting actual status of rockfill in specific conditions is determined.In combination with genetic algorithm,the BP neural network is used to back calculate the optimal parameters of the model,then analyze and calculate the predicted rockfill settlement and deformation during construction.By analysis and comparison of the predicted settlement and deformation with the measured settlement and deformation of the completed rockfill,and taking the predicted settlement and deformation of rockfill for reference,the settlement period is rationally prepared in advance and face slab placement time is reasonably determined so as to prevent negative influence of large rockfill settlement and deformation on the face slabs and improve the stress and deformation of face slabs.

Key concepts: Slab, Settlement (finance), Deformation (meteorology), Geotechnical engineering, Structural engineering, Face (sociological concept), Geology, Stress (linguistics)