2009•Tiedao gongcheng xuebaoRequires access

Control of Sand Storm in the Section between Golmud and Lhasa of Qinghai-Tibet Railway

Wang Duo-qing

Open publisher page 0 citations

Abstract

Research purposes:The Qinghai-Tibet Plateau has a special geographical and climatic environment with the weak ecological conditions.The sand storm along Qinghai-Tibet Railway is widely spread,with complicated and violent movement to bring serious danger to the railway.So it is necessary to study and summarize the distribution,characteristics,control methods and control effect of sand storm along Qinghai-Tibet Railway for providing the references to maintenance of the railway and to the similar works.Research conclusions:There are Semi-fixed dune and active dune along Qinghai-Tibet Railway.The sand flow is development and river area is also the place where the sand storm happens frequently with complicated and violent movement.The control of the sand storm in this area is long-term process.The principle of Putting Prevention First and Combining Prevention with Control should be followed by adopting the method of putting the project prevention of sand storm first and adjusting measures to local conditions to conduct comprehensive control.During the operation of Qinghai-Tibet Railway,it is necessary to do the studies on the technologies for controlling the sand storm and ensuring the safety of the railway in sand storm area and river area.The accumulated sand should be cleaned up in time and environment protection should be strengthened.

About this research paper

What this paper is about

Research purposes:The Qinghai-Tibet Plateau has a special geographical and climatic environment with the weak ecological conditions.The sand storm along Qinghai-Tibet Railway is widely spread,with complicated and violent movement to bring serious danger to the railway.So it is necessary to study and summarize the distribution,characteristics,control methods and control effect of sand storm along Qinghai-Tibet Railway for providing the references to maintenance of the railway and to the similar works.Research conclusions:There are Semi-fixed dune and active dune along Qinghai-Tibet Railway.The sand flow is development and river area is also the place where the sand storm happens frequently with complicated and violent movement.The control of the sand storm in this area is long-term process.The principle of Putting Prevention First and Combining Prevention with Control should be followed by adopting the method of putting the project prevention of sand storm first and adjusting measures to local conditions to conduct comprehensive control.During the operation of Qinghai-Tibet Railway,it is necessary to do the studies on the technologies for controlling the sand storm and ensuring the safety of the railway in sand storm area and river area.The accumulated sand should be cleaned up in time and environment protection should be strengthened.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Research purposes:The Qinghai-Tibet Plateau has a special geographical and climatic environment with the weak ecological conditions.The sand storm along Qinghai-Tibet Railway is widely spread,with complicated and violent movement to bring serious danger to the railway.So it is necessary to study and summarize the distribution,characteristics,control methods and control effect of sand storm along Qinghai-Tibet Railway for providing the references to maintenance of the railway and to the similar works.Research conclusions:There are Semi-fixed dune and active dune along Qinghai-Tibet Railway.The sand flow is development and river area is also the place where the sand storm happens frequently with complicated and violent movement.The control of the sand storm in this area is long-term process.The principle of Putting Prevention First and Combining Prevention with Control should be followed by adopting the method of putting the project prevention of sand storm first and adjusting measures to local conditions to conduct comprehensive control.During the operation of Qinghai-Tibet Railway,it is necessary to do the studies on the technologies for controlling the sand storm and ensuring the safety of the railway in sand storm area and river area.The accumulated sand should be cleaned up in time and environment protection should be strengthened.

Key concepts: Storm, Plateau (mathematics), Hydrology (agriculture), Sand dune stabilization, Geology, Environmental science, Physical geography, Mining engineering