Consolidation Mechanism of Post-grouting for Bored Grouting Pile and the Application
Zhang Shun-ying
Abstract
Zhang Shun-ying
Abstract
The technical advantages of post-grouting for bored grouting pile are shorter length of pile,the bearing capacity improvement,less number of piles,good quality of pile foundation and the cost saving.Based on the engineering cases,the paper described the consolidation mechanism of compound post grouting for the end and the side of the pile,the empirical formula of bearing capacity,control points and control measures.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The technical advantages of post-grouting for bored grouting pile are shorter length of pile,the bearing capacity improvement,less number of piles,good quality of pile foundation and the cost saving.Based on the engineering cases,the paper described the consolidation mechanism of compound post grouting for the end and the side of the pile,the empirical formula of bearing capacity,control points and control measures.
Key concepts: Pile, Consolidation (business), Geotechnical engineering, Bearing capacity, Engineering, Accounting, Business