The mechanism analysis and engineering application of post grouting cast-in-place bored pile bearing capacity

Wu Cha

Open publisher page 1 citations

Abstract

The working mechanism,construction technology of post grouting cast-in-place bored pile technology was introduced.Combined with four piles static load test before and after adopting pile tip and pile side post grouting and without grouting construction comparison,the post grouting technology influences on cast-in-place bored pile bearing capacity and engineering cost were analyzed,so as to popularize post grouting technology application.

About this research paper

What this paper is about

The working mechanism,construction technology of post grouting cast-in-place bored pile technology was introduced.Combined with four piles static load test before and after adopting pile tip and pile side post grouting and without grouting construction comparison,the post grouting technology influences on cast-in-place bored pile bearing capacity and engineering cost were analyzed,so as to popularize post grouting technology application.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The working mechanism,construction technology of post grouting cast-in-place bored pile technology was introduced.Combined with four piles static load test before and after adopting pile tip and pile side post grouting and without grouting construction comparison,the post grouting technology influences on cast-in-place bored pile bearing capacity and engineering cost were analyzed,so as to popularize post grouting technology application.

Key concepts: Pile, Bearing capacity, Geotechnical engineering, Engineering, Mechanism (biology), Load bearing, Bearing (navigation), Failure mechanism

Related papers

Back to paper searchBrowse research topicsOriginal source
The mechanism analysis and engineering application of post grouting cast-in-place bored pile bearing capacity — Research Paper | ScholarLens