Simulation and Prediction of Groundwater Level at Hatoucaidang Source Field
Yili Zhang
Abstract
Yili Zhang
Abstract
Numerical simulation of groundwater resources at Hatoucaidang source field was carried out with MODFLOW software.The parameters selected in simulation model were reasonable basically and the model could actually reflect the practical characters of flow field really according to the model identification and verification.Based on the model identification and verification,the initial condition,boundary condition and source collection item were given.The groundwater level was predicted from Oct.2009 to Oct.2029.The results show that the continuous downward tendency of groundwater level of source field will not appear under the designed exploit condition.The groundwater level drawdown predicted by all kinds of schemes is generally small,and the drawdown of most simulation area is mostly less than 6 m,and the whole drawdown is relative small,which will not bring obvious influence to the ecological environment.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Numerical simulation of groundwater resources at Hatoucaidang source field was carried out with MODFLOW software.The parameters selected in simulation model were reasonable basically and the model could actually reflect the practical characters of flow field really according to the model identification and verification.Based on the model identification and verification,the initial condition,boundary condition and source collection item were given.The groundwater level was predicted from Oct.2009 to Oct.2029.The results show that the continuous downward tendency of groundwater level of source field will not appear under the designed exploit condition.The groundwater level drawdown predicted by all kinds of schemes is generally small,and the drawdown of most simulation area is mostly less than 6 m,and the whole drawdown is relative small,which will not bring obvious influence to the ecological environment.
Key concepts: MODFLOW, Drawdown (hydrology), Groundwater, Groundwater flow, Field (mathematics), Environmental science, Identification (biology), Boundary value problem