Construction Control of Hybrid Girder Cable-Stayed Bridge with a Single Column Inclined Pylon

Jiwei Zhong

Open publisher page 1 citations

Abstract

Against the background of the Hero Bridge in Nanchang,this paper presents the difficulties and key points of construction control of the hybrid girder cable-stayed bridge with a single column inclined pylon,the principle of determination of the rational completed bridge state and the method for determination of the cable forces during construction and also analyzes the sensitivity of various structural parameters of such type of the bridge.The results of testing of the completed bridge show that the geometric shape of the main girder of the bridge satisfies the design requirements,the structural stress conditions are good and the differences between the cable forces and the theoretic values are less than 5%.

About this research paper

What this paper is about

Against the background of the Hero Bridge in Nanchang,this paper presents the difficulties and key points of construction control of the hybrid girder cable-stayed bridge with a single column inclined pylon,the principle of determination of the rational completed bridge state and the method for determination of the cable forces during construction and also analyzes the sensitivity of various structural parameters of such type of the bridge.The results of testing of the completed bridge show that the geometric shape of the main girder of the bridge satisfies the design requirements,the structural stress conditions are good and the differences between the cable forces and the theoretic values are less than 5%.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Against the background of the Hero Bridge in Nanchang,this paper presents the difficulties and key points of construction control of the hybrid girder cable-stayed bridge with a single column inclined pylon,the principle of determination of the rational completed bridge state and the method for determination of the cable forces during construction and also analyzes the sensitivity of various structural parameters of such type of the bridge.The results of testing of the completed bridge show that the geometric shape of the main girder of the bridge satisfies the design requirements,the structural stress conditions are good and the differences between the cable forces and the theoretic values are less than 5%.

Key concepts: Pylon, Bridge (graph theory), Structural engineering, Girder, Engineering, Column (typography), Internal forces, Connection (principal bundle)

Related papers

Back to paper searchBrowse research topicsOriginal source
Construction Control of Hybrid Girder Cable-Stayed Bridge with a Single Column Inclined Pylon — Research Paper | ScholarLens