Main technical problems and research achievement of 12.5 m deep-water channel construction phase I of the Yangtze River below Nanjing city

Qian Ming-xia

Open publisher page 0 citations

Abstract

This paper proposes the main technical problems in the first-stage project of 12.5 m deepwater channel of the Yangtze River below Nanjing city,such as water and sediment movement characteristics and navigation-obstructing characteristics,channel regulation and the timing of key parts,waterway regulation scheme optimization,and waterway’s new regulation structures,and analyzes the solutions to these problems and achievements,which are helpful for the acknowledgement of the construction and understanding of tidal river waterway regulation technology.

About this research paper

What this paper is about

This paper proposes the main technical problems in the first-stage project of 12.5 m deepwater channel of the Yangtze River below Nanjing city,such as water and sediment movement characteristics and navigation-obstructing characteristics,channel regulation and the timing of key parts,waterway regulation scheme optimization,and waterway’s new regulation structures,and analyzes the solutions to these problems and achievements,which are helpful for the acknowledgement of the construction and understanding of tidal river waterway regulation technology.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper proposes the main technical problems in the first-stage project of 12.5 m deepwater channel of the Yangtze River below Nanjing city,such as water and sediment movement characteristics and navigation-obstructing characteristics,channel regulation and the timing of key parts,waterway regulation scheme optimization,and waterway’s new regulation structures,and analyzes the solutions to these problems and achievements,which are helpful for the acknowledgement of the construction and understanding of tidal river waterway regulation technology.

Key concepts: Channel (broadcasting), Yangtze river, Acknowledgement, River regime, Civil engineering, Environmental science, Hydrology (agriculture), Sediment

Related papers

Back to paper searchBrowse research topicsOriginal source
Main technical problems and research achievement of 12.5 m deep-water channel construction phase I of the Yangtze River below Nanjing city — Research Paper | ScholarLens