2010Oil Field EquipmentRequires access

Discussion of Drilling Derrick Installation of Fixed Offshore Drilling and Production Platform

Yang Jian-xiong

Open publisher page 0 citations

Abstract

Due to the complex offshore environment and drilling operation conditions,the structure of offshore drilling derrick must have high strength,high stability,wider bottom spaces and better driller's sight.The offshore drilling operators prefer to the tower type derrick.But the installation of the derrick to the fixed platform is difficult to perform due to the limits of the installation resources,environment conditions,installation duration and costs.The factors affected the derrick installation was analyzed,and the installation method was presented-lift installation of lower section and upper section assembling on site,which was successfully applied on the offshore derrick installation and provided the good reference for the future derrick installation on offshore fixed production and drilling platform,specially in extremely East and South Sea environment conditions.

About this research paper

What this paper is about

Due to the complex offshore environment and drilling operation conditions,the structure of offshore drilling derrick must have high strength,high stability,wider bottom spaces and better driller's sight.The offshore drilling operators prefer to the tower type derrick.But the installation of the derrick to the fixed platform is difficult to perform due to the limits of the installation resources,environment conditions,installation duration and costs.The factors affected the derrick installation was analyzed,and the installation method was presented-lift installation of lower section and upper section assembling on site,which was successfully applied on the offshore derrick installation and provided the good reference for the future derrick installation on offshore fixed production and drilling platform,specially in extremely East and South Sea environment conditions.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Due to the complex offshore environment and drilling operation conditions,the structure of offshore drilling derrick must have high strength,high stability,wider bottom spaces and better driller's sight.The offshore drilling operators prefer to the tower type derrick.But the installation of the derrick to the fixed platform is difficult to perform due to the limits of the installation resources,environment conditions,installation duration and costs.The factors affected the derrick installation was analyzed,and the installation method was presented-lift installation of lower section and upper section assembling on site,which was successfully applied on the offshore derrick installation and provided the good reference for the future derrick installation on offshore fixed production and drilling platform,specially in extremely East and South Sea environment conditions.

Key concepts: Submarine pipeline, Engineering, Offshore drilling, Drilling, Drilling rig, Offshore construction, Marine engineering, Lift (data mining)

Related papers

Back to paper searchBrowse research topicsOriginal source
Discussion of Drilling Derrick Installation of Fixed Offshore Drilling and Production Platform — Research Paper | ScholarLens