2008Soil Engineering and FoundationRequires access

Study of Post Grouting Technology of Bored Cast-in-place Pile

Tie Zhang

Open publisher page 0 citations

Abstract

The post grouting technology of bored cast-in-place pile is the convenient and efficient method,which is used to improve the bearing performance of pile.The mechanism of axial bearing performance of single pile increased by the post grouting technology and the construction craft are introduced,then,the bearing performance before and after grouting of the bored cast-in-place pile is also introduced in the Zhengzhou Second Yellow-river Highway Bridge engineering.

About this research paper

What this paper is about

The post grouting technology of bored cast-in-place pile is the convenient and efficient method,which is used to improve the bearing performance of pile.The mechanism of axial bearing performance of single pile increased by the post grouting technology and the construction craft are introduced,then,the bearing performance before and after grouting of the bored cast-in-place pile is also introduced in the Zhengzhou Second Yellow-river Highway Bridge engineering.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The post grouting technology of bored cast-in-place pile is the convenient and efficient method,which is used to improve the bearing performance of pile.The mechanism of axial bearing performance of single pile increased by the post grouting technology and the construction craft are introduced,then,the bearing performance before and after grouting of the bored cast-in-place pile is also introduced in the Zhengzhou Second Yellow-river Highway Bridge engineering.

Key concepts: Pile, Geotechnical engineering, Bridge (graph theory), Bearing (navigation), Engineering, Bearing capacity, Craft, Computer science

Related papers

Back to paper searchBrowse research topicsOriginal source
Study of Post Grouting Technology of Bored Cast-in-place Pile — Research Paper | ScholarLens