2009Resources Environment & EngineeringRequires access

Research and Treatment on Main Engineering Geologic Problems of Zhaolaihe River Arch Dam

Zhou Lunxin

Open publisher page 1 citations

Abstract

The dam of Zhaolaihe River hydropower station,a thin,logarithmic spiral double-curvature arch dam,is made of rolled concrete,with complex topographical and geological conditions on the position of the dam,which is chosed after many comparison and argumentation.Toward the principal engineering geological problems on the dam base,the authors took on scientific and proper measures in construction,which not only shortened time of stable construction,but also saved investment on the project.

About this research paper

What this paper is about

The dam of Zhaolaihe River hydropower station,a thin,logarithmic spiral double-curvature arch dam,is made of rolled concrete,with complex topographical and geological conditions on the position of the dam,which is chosed after many comparison and argumentation.Toward the principal engineering geological problems on the dam base,the authors took on scientific and proper measures in construction,which not only shortened time of stable construction,but also saved investment on the project.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The dam of Zhaolaihe River hydropower station,a thin,logarithmic spiral double-curvature arch dam,is made of rolled concrete,with complex topographical and geological conditions on the position of the dam,which is chosed after many comparison and argumentation.Toward the principal engineering geological problems on the dam base,the authors took on scientific and proper measures in construction,which not only shortened time of stable construction,but also saved investment on the project.

Key concepts: Arch dam, Hydropower, Geology, Arch, Geotechnical engineering, Civil engineering, Engineering, Mining engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Research and Treatment on Main Engineering Geologic Problems of Zhaolaihe River Arch Dam — Research Paper | ScholarLens