According to the excavation to the second tunnel of hydropower station in Xin Jiang. It introduces the watery,loose sand, gravel, shale composite stratigraphic excavation and the support construction technology. During the construction, it follows some principles, including: super anticipation, pipe ahead, grouting, short excavation and less disturbance, strong support, quick closing and strict water measuring. The excavation is optimized and the scheme is supported continuously. Under the premise of ensuring the safety and quality, the construction schedule is accelerated.Thus, the ideal social and economic benefits can be achieved.

About this research paper

What this paper is about

According to the excavation to the second tunnel of hydropower station in Xin Jiang. It introduces the watery,loose sand, gravel, shale composite stratigraphic excavation and the support construction technology. During the construction, it follows some principles, including: super anticipation, pipe ahead, grouting, short excavation and less disturbance, strong support, quick closing and strict water measuring. The excavation is optimized and the scheme is supported continuously. Under the premise of ensuring the safety and quality, the construction schedule is accelerated.Thus, the ideal social and economic benefits can be achieved.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

According to the excavation to the second tunnel of hydropower station in Xin Jiang. It introduces the watery,loose sand, gravel, shale composite stratigraphic excavation and the support construction technology. During the construction, it follows some principles, including: super anticipation, pipe ahead, grouting, short excavation and less disturbance, strong support, quick closing and strict water measuring. The excavation is optimized and the scheme is supported continuously. Under the premise of ensuring the safety and quality, the construction schedule is accelerated.Thus, the ideal social and economic benefits can be achieved.

Key concepts: Excavation, Hydropower, Schedule, Engineering, Tunnel construction, Civil engineering, Geotechnical engineering, Mining engineering