Multivariate geological structure of tunnel excavation and support construction technology
Yuan Yua
Abstract
Yuan Yua
Abstract
According to the excavation to the second tunnel of hydropower station in Xin Jiang. It introduces the watery,loose sand, gravel, shale composite stratigraphic excavation and the support construction technology. During the construction, it follows some principles, including: super anticipation, pipe ahead, grouting, short excavation and less disturbance, strong support, quick closing and strict water measuring. The excavation is optimized and the scheme is supported continuously. Under the premise of ensuring the safety and quality, the construction schedule is accelerated.Thus, the ideal social and economic benefits can be achieved.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
According to the excavation to the second tunnel of hydropower station in Xin Jiang. It introduces the watery,loose sand, gravel, shale composite stratigraphic excavation and the support construction technology. During the construction, it follows some principles, including: super anticipation, pipe ahead, grouting, short excavation and less disturbance, strong support, quick closing and strict water measuring. The excavation is optimized and the scheme is supported continuously. Under the premise of ensuring the safety and quality, the construction schedule is accelerated.Thus, the ideal social and economic benefits can be achieved.
Key concepts: Excavation, Hydropower, Schedule, Engineering, Tunnel construction, Civil engineering, Geotechnical engineering, Mining engineering