A Study on the Pipe laying Technology in Shallow beach Sea
Jian Zhang
Abstract
Jian Zhang
Abstract
An offshore pipe laying and cable laying barge was designed and built for shengli Offshore Oilfield and for other shallow water oilfields in Bohai Bay.The design scheme of pipe laying and cable laying technology for this barge is introduced and discussed,which includes the pipe laying in the first stage,the normal pipe laying operation,the installation of riser,the pipe constant tension control,the process of pipe abandon and pipe collection,the control of barge positioning and transportation etc.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
An offshore pipe laying and cable laying barge was designed and built for shengli Offshore Oilfield and for other shallow water oilfields in Bohai Bay.The design scheme of pipe laying and cable laying technology for this barge is introduced and discussed,which includes the pipe laying in the first stage,the normal pipe laying operation,the installation of riser,the pipe constant tension control,the process of pipe abandon and pipe collection,the control of barge positioning and transportation etc.
Key concepts: BARGE, Laying, Submarine pipeline, Engineering, Marine engineering, Tension (geology), Bay, Water pipe