2008Electric Power ConstructionRequires access

Tower Assembling and Erection Technology Using Seating-Type 4-rocker Lifting Pole

Weimin Mao

Open publisher page 1 citations

Abstract

Tower assembling and erection using seating-type 4-rocker lifting pole is specially developed for tower constructions in confined sites.It can be widely applied in 500 kV line projects where construction sites are confined,and no available space near tower foundation;construction sites are narrow or close to live higher voltage lines,unable to lay control cable and temporary guys;large,heavy and oversized crossarm installation.It also accumulates experiences for higher voltage transmission tower assembly.

About this research paper

What this paper is about

Tower assembling and erection using seating-type 4-rocker lifting pole is specially developed for tower constructions in confined sites.It can be widely applied in 500 kV line projects where construction sites are confined,and no available space near tower foundation;construction sites are narrow or close to live higher voltage lines,unable to lay control cable and temporary guys;large,heavy and oversized crossarm installation.It also accumulates experiences for higher voltage transmission tower assembly.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Tower assembling and erection using seating-type 4-rocker lifting pole is specially developed for tower constructions in confined sites.It can be widely applied in 500 kV line projects where construction sites are confined,and no available space near tower foundation;construction sites are narrow or close to live higher voltage lines,unable to lay control cable and temporary guys;large,heavy and oversized crossarm installation.It also accumulates experiences for higher voltage transmission tower assembly.

Key concepts: Tower, Engineering, Structural engineering, Electrical engineering, Transmission line, Transmission tower, Line (geometry), Electric power transmission