2012•Northwest HydropowerRequires access

Study on Application of Digital Technology for Dam,Nuozhadu Hydropower Project

Xiao Chuang

Open publisher page 0 citations

Abstract

Construction of rockfill dam with high cutoff wall has become a tendency of dam structure at home and abroad.It is significant to realize information integration,dynamic management and high-efficiency analysis during high-dam construction.In this paper,Nuozhadu Hydropower Project is taken as an example.The dam digital control technology system which is applied for the control of dam construction progress and quality is analyzed fully.In combination of the application process of the digital technology,the system control processes for roller compaction and roller compaction overspeed are addressed specially.The study shows proves that this digital technology system can effectively control the construction process in real time and fully.The dam digital control technology is one importance exploration on integrated information management and auxiliary decision-making system application during construction of rockfill dam with high cutoff wall in China.

About this research paper

What this paper is about

Construction of rockfill dam with high cutoff wall has become a tendency of dam structure at home and abroad.It is significant to realize information integration,dynamic management and high-efficiency analysis during high-dam construction.In this paper,Nuozhadu Hydropower Project is taken as an example.The dam digital control technology system which is applied for the control of dam construction progress and quality is analyzed fully.In combination of the application process of the digital technology,the system control processes for roller compaction and roller compaction overspeed are addressed specially.The study shows proves that this digital technology system can effectively control the construction process in real time and fully.The dam digital control technology is one importance exploration on integrated information management and auxiliary decision-making system application during construction of rockfill dam with high cutoff wall in China.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Construction of rockfill dam with high cutoff wall has become a tendency of dam structure at home and abroad.It is significant to realize information integration,dynamic management and high-efficiency analysis during high-dam construction.In this paper,Nuozhadu Hydropower Project is taken as an example.The dam digital control technology system which is applied for the control of dam construction progress and quality is analyzed fully.In combination of the application process of the digital technology,the system control processes for roller compaction and roller compaction overspeed are addressed specially.The study shows proves that this digital technology system can effectively control the construction process in real time and fully.The dam digital control technology is one importance exploration on integrated information management and auxiliary decision-making system application during construction of rockfill dam with high cutoff wall in China.

Key concepts: Hydropower, Engineering, Control (management), Process (computing), Civil engineering, Digital control, Construction engineering, Computer science

Related papers

Back to paper searchBrowse research topicsOriginal source
Study on Application of Digital Technology for Dam,Nuozhadu Hydropower Project — Research Paper | ScholarLens