On new technique of mixed ventilation in long and large tunnel construction
Zhang Xiao-w
Abstract
Zhang Xiao-w
Abstract
By combining with the current situation of the tunnel projects in China,the paper analyzes the ventilation air dynamic principles for the tunnels,explores the common ventilation methods in current tunnel construction,improves the ventilation schemes of the tunnel construction from the field production,and points out the sectional mixed ventilation scheme.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
By combining with the current situation of the tunnel projects in China,the paper analyzes the ventilation air dynamic principles for the tunnels,explores the common ventilation methods in current tunnel construction,improves the ventilation schemes of the tunnel construction from the field production,and points out the sectional mixed ventilation scheme.
Key concepts: Ventilation (architecture), Current (fluid), Tunnel construction, Engineering, Civil engineering, Environmental science, Structural engineering, Mechanical engineering