Comprehensive Commissioning Technology for the East-section Pipeline of West-to-East Gas Transmission Pipeline
Bao Chenglin
Abstract
Bao Chenglin
Abstract
This paper introduces the comprehensive commissioning technology for the East-section Pipeline (Shanghai-Jingbian Pipeline Section) of West-to-East Gas Transmission Pipeline, including the operation steps involved in pigging, calibration, water test and dewatering. It is considered that the comprehensive commissioning technology can be taken as an important criterion for other pipeline construction.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This paper introduces the comprehensive commissioning technology for the East-section Pipeline (Shanghai-Jingbian Pipeline Section) of West-to-East Gas Transmission Pipeline, including the operation steps involved in pigging, calibration, water test and dewatering. It is considered that the comprehensive commissioning technology can be taken as an important criterion for other pipeline construction.
Key concepts: Pipeline (software), Pigging, Section (typography), Project commissioning, Gas pipeline, Dewatering, Engineering, Pipeline transport