2007Jianzhu jishuRequires access

MONITORING TECHNOLOGY IN INFORMATION-BASED CONSTRUCTION OF DEEP PIT WORKS IN SOUTH ANCHORAGE FOUNDATION OF WUHAN YANGLUO YANGTZE RIVER BRIDGE

Xu Wei

Open publisher page 0 citations

Abstract

On account of the complicated geological condition, deep excavation depth, too many brackets, big construction difficulties and lack of previous experiences, a strict monitoring system must be established in the construction organization design and implemented in the construction of the bridge foundation so as to analyze and process the measured data in time. In the information-based construction of the deep pit excavation, construction measures, sequences and steps were timely adjusted through optimization on the base of monitoring data, ensuring to carry out the construction smoothly.

About this research paper

What this paper is about

On account of the complicated geological condition, deep excavation depth, too many brackets, big construction difficulties and lack of previous experiences, a strict monitoring system must be established in the construction organization design and implemented in the construction of the bridge foundation so as to analyze and process the measured data in time. In the information-based construction of the deep pit excavation, construction measures, sequences and steps were timely adjusted through optimization on the base of monitoring data, ensuring to carry out the construction smoothly.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

On account of the complicated geological condition, deep excavation depth, too many brackets, big construction difficulties and lack of previous experiences, a strict monitoring system must be established in the construction organization design and implemented in the construction of the bridge foundation so as to analyze and process the measured data in time. In the information-based construction of the deep pit excavation, construction measures, sequences and steps were timely adjusted through optimization on the base of monitoring data, ensuring to carry out the construction smoothly.

Key concepts: Excavation, Foundation (evidence), Bridge (graph theory), Yangtze river, Civil engineering, Construction engineering, Engineering, Process (computing)

Related papers

Back to paper searchBrowse research topicsOriginal source
MONITORING TECHNOLOGY IN INFORMATION-BASED CONSTRUCTION OF DEEP PIT WORKS IN SOUTH ANCHORAGE FOUNDATION OF WUHAN YANGLUO YANGTZE RIVER BRIDGE — Research Paper | ScholarLens