Rock Mechanical Study of Underground Powerhousein Shuibuya Project

Aiqing Wu

Open publisher page 0 citations

Abstract

The key rock mechanical problems of the underground powerhouse in Shuibuya Project are the complicated rock structures and the control effect of soft rock on the surrounding rock of the grotto.In combination with the rock mechanical problems,a systematic research in different aspects of rock mechanics based on a carefully issued research scheme has been carried out,which includes the initial geo-stress distribution features,rock mechanical properties,engineering rock classifications by different methods,numerical modeling for stability and support analysis,safety margin for over-loading and failure features,proper measures for rock excavation and supporting,etc.The results show that rock excavations of the underground powerhouse for the given geological conditions can be achieved technically.Some measures,suggested by the designer,which mainly consist of the soft rock replacements by concrete in local area below the crane beam,the shotcrete and reinforcement by rock bolts and anchor cables in surrounding rock,resulting in a reinforced rock walls between the tailrace tubes,etc.,are proved to be reasonable and effective.This paper briefly presents some relevant results.

About this research paper

What this paper is about

The key rock mechanical problems of the underground powerhouse in Shuibuya Project are the complicated rock structures and the control effect of soft rock on the surrounding rock of the grotto.In combination with the rock mechanical problems,a systematic research in different aspects of rock mechanics based on a carefully issued research scheme has been carried out,which includes the initial geo-stress distribution features,rock mechanical properties,engineering rock classifications by different methods,numerical modeling for stability and support analysis,safety margin for over-loading and failure features,proper measures for rock excavation and supporting,etc.The results show that rock excavations of the underground powerhouse for the given geological conditions can be achieved technically.Some measures,suggested by the designer,which mainly consist of the soft rock replacements by concrete in local area below the crane beam,the shotcrete and reinforcement by rock bolts and anchor cables in surrounding rock,resulting in a reinforced rock walls between the tailrace tubes,etc.,are proved to be reasonable and effective.This paper briefly presents some relevant results.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The key rock mechanical problems of the underground powerhouse in Shuibuya Project are the complicated rock structures and the control effect of soft rock on the surrounding rock of the grotto.In combination with the rock mechanical problems,a systematic research in different aspects of rock mechanics based on a carefully issued research scheme has been carried out,which includes the initial geo-stress distribution features,rock mechanical properties,engineering rock classifications by different methods,numerical modeling for stability and support analysis,safety margin for over-loading and failure features,proper measures for rock excavation and supporting,etc.The results show that rock excavations of the underground powerhouse for the given geological conditions can be achieved technically.Some measures,suggested by the designer,which mainly consist of the soft rock replacements by concrete in local area below the crane beam,the shotcrete and reinforcement by rock bolts and anchor cables in surrounding rock,resulting in a reinforced rock walls between the tailrace tubes,etc.,are proved to be reasonable and effective.This paper briefly presents some relevant results.

Key concepts: Shotcrete, Rock bolt, Excavation, Geotechnical engineering, Rock mass rating, Geology, Rock mechanics, Rock mass classification