2009•Sichuan Water PowerRequires access

Study on Stability of Extra Large Span Underground Powerhouse during Construction

Hongtao Li

Open publisher page 0 citations

Abstract

At Xiangjiaba Hydropower Station,the extra large underground powerhouse is located in rock with relatively poor geological conditions and is affected by some faults and weak interlayers with developed rock joints.Therefore,rock stability during construction is prominent.In this paper,dominant factors influencing surrounding rock stability are analyzed and characteristics of surrounding rock stability are studied.In the same time,correlated rules of rock stability and influence of corresponding construction measures during construction are investigated by numerical simulation.The analysis results give references to other similar projects and provide guidance to project design and construction.

About this research paper

What this paper is about

At Xiangjiaba Hydropower Station,the extra large underground powerhouse is located in rock with relatively poor geological conditions and is affected by some faults and weak interlayers with developed rock joints.Therefore,rock stability during construction is prominent.In this paper,dominant factors influencing surrounding rock stability are analyzed and characteristics of surrounding rock stability are studied.In the same time,correlated rules of rock stability and influence of corresponding construction measures during construction are investigated by numerical simulation.The analysis results give references to other similar projects and provide guidance to project design and construction.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

At Xiangjiaba Hydropower Station,the extra large underground powerhouse is located in rock with relatively poor geological conditions and is affected by some faults and weak interlayers with developed rock joints.Therefore,rock stability during construction is prominent.In this paper,dominant factors influencing surrounding rock stability are analyzed and characteristics of surrounding rock stability are studied.In the same time,correlated rules of rock stability and influence of corresponding construction measures during construction are investigated by numerical simulation.The analysis results give references to other similar projects and provide guidance to project design and construction.

Key concepts: Stability (learning theory), Span (engineering), Hydropower, Geotechnical engineering, Geology, Mining engineering, Rock mass classification, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Study on Stability of Extra Large Span Underground Powerhouse during Construction — Research Paper | ScholarLens