2008Shanxi ArchitectureRequires access

Discussion on the span closure section construction in continuous rigid-framed bridge

Xiaoli Liu

Open publisher page 0 citations

Abstract

The construction method and closure sequence of over combined section in No.5 bid section civil engineering Shawan Bridge of rail transit No.4 line from Chebonan to Huangge section in Guangzhou were introduced,which provide references for the similar engineering.

About this research paper

What this paper is about

The construction method and closure sequence of over combined section in No.5 bid section civil engineering Shawan Bridge of rail transit No.4 line from Chebonan to Huangge section in Guangzhou were introduced,which provide references for the similar engineering.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The construction method and closure sequence of over combined section in No.5 bid section civil engineering Shawan Bridge of rail transit No.4 line from Chebonan to Huangge section in Guangzhou were introduced,which provide references for the similar engineering.

Key concepts: Section (typography), Bridge (graph theory), Closure (psychology), Span (engineering), Engineering, Structural engineering, Sequence (biology), Civil engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Discussion on the span closure section construction in continuous rigid-framed bridge — Research Paper | ScholarLens