After comparing dam types,the dam of Suofengyin Hydropower Station was determined to choose RCC gravity one.The dam with a highest of 115.8 m and a dam crest length of 164.58 m is made up with two block dam sections on the right and left banks and a spelling section on the river bed.The structure design and selection of concrete materials are favorable to quicken constructing and rolling on a big plane.Comparing with common concrete dam types,RCC dam has some features such as using less cement,simplifying measure of temperature control,shortening construction period,less cost and etc.

About this research paper

What this paper is about

After comparing dam types,the dam of Suofengyin Hydropower Station was determined to choose RCC gravity one.The dam with a highest of 115.8 m and a dam crest length of 164.58 m is made up with two block dam sections on the right and left banks and a spelling section on the river bed.The structure design and selection of concrete materials are favorable to quicken constructing and rolling on a big plane.Comparing with common concrete dam types,RCC dam has some features such as using less cement,simplifying measure of temperature control,shortening construction period,less cost and etc.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

After comparing dam types,the dam of Suofengyin Hydropower Station was determined to choose RCC gravity one.The dam with a highest of 115.8 m and a dam crest length of 164.58 m is made up with two block dam sections on the right and left banks and a spelling section on the river bed.The structure design and selection of concrete materials are favorable to quicken constructing and rolling on a big plane.Comparing with common concrete dam types,RCC dam has some features such as using less cement,simplifying measure of temperature control,shortening construction period,less cost and etc.

Key concepts: Gravity dam, Hydropower, Roller-compacted concrete, Crest, Geotechnical engineering, Geology, Engineering, Block (permutation group theory)

Related papers

Back to paper searchBrowse research topicsOriginal source
Design of RCC Gravity Dam of Suofengyin Hydropower Station — Research Paper | ScholarLens