RCC dam design of Pengshui hydropower station
Huang Hong-fei
Abstract
Huang Hong-fei
Abstract
Pengshui dam is an arched RCC gravity one with the maximum dam height of 116.5 m.The top openings are designed for flood release and the dam body under the top openings is RCC with its volume of 587.6 thousand m~3,accounting for 58% of total dam concrete volume.The overall RCC economic cross-section is designed for the dam.This paper presents the stress analysis, concrete mix ratio,seepage control scheme and the simplification of dam structure layout.The foundation consolidation grouting with levelled concrete layer plugging is adopted for geologic defect-free position to realize quick RCC construction.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Pengshui dam is an arched RCC gravity one with the maximum dam height of 116.5 m.The top openings are designed for flood release and the dam body under the top openings is RCC with its volume of 587.6 thousand m~3,accounting for 58% of total dam concrete volume.The overall RCC economic cross-section is designed for the dam.This paper presents the stress analysis, concrete mix ratio,seepage control scheme and the simplification of dam structure layout.The foundation consolidation grouting with levelled concrete layer plugging is adopted for geologic defect-free position to realize quick RCC construction.
Key concepts: Gravity dam, Consolidation (business), Geotechnical engineering, Hydropower, Foundation (evidence), Engineering, Geology, Roller-compacted concrete