General Latout Study on Xiniu Project of Lianjiang River
Xujin Zhang
Abstract
Xujin Zhang
Abstract
By hydraulic model test,the general plane layout scheme of the Xiniu project of Lianjiang River is optimized from many aspects.The left bank Scheme 2,with the best navigational condition,less amount and stable bed evolution,is recommended.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
By hydraulic model test,the general plane layout scheme of the Xiniu project of Lianjiang River is optimized from many aspects.The left bank Scheme 2,with the best navigational condition,less amount and stable bed evolution,is recommended.
Key concepts: Scheme (mathematics), Hydrology (agriculture), Plane (geometry), Test (biology), Geology, Civil engineering, Environmental science, Engineering