Tunnel Engineering Construction Schedule Analysis and Management Based on Visual Simulation

Zhong Wei

Open publisher page 0 citations

Abstract

The methodology of visual simulation for a tunnel engineering construction schedule is presented. Visualization of simulation model, calculation and result of construction schedule simulation is realized, and the construction simulation and the resource optimization of tunnel engineering are made. A risk analysis and a decision-making method of tunnel engineering construction schedule based on visual simulation are presented. Furthermore, using S curve theory and schedule management method, the real-time management and control method of tunnel engineering construction based on visual simulation is presented. The application to the tunnel engineering construction schedule analysis and management shows the feasibility and effectiveness of the method presented in this paper.

About this research paper

What this paper is about

The methodology of visual simulation for a tunnel engineering construction schedule is presented. Visualization of simulation model, calculation and result of construction schedule simulation is realized, and the construction simulation and the resource optimization of tunnel engineering are made. A risk analysis and a decision-making method of tunnel engineering construction schedule based on visual simulation are presented. Furthermore, using S curve theory and schedule management method, the real-time management and control method of tunnel engineering construction based on visual simulation is presented. The application to the tunnel engineering construction schedule analysis and management shows the feasibility and effectiveness of the method presented in this paper.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The methodology of visual simulation for a tunnel engineering construction schedule is presented. Visualization of simulation model, calculation and result of construction schedule simulation is realized, and the construction simulation and the resource optimization of tunnel engineering are made. A risk analysis and a decision-making method of tunnel engineering construction schedule based on visual simulation are presented. Furthermore, using S curve theory and schedule management method, the real-time management and control method of tunnel engineering construction based on visual simulation is presented. The application to the tunnel engineering construction schedule analysis and management shows the feasibility and effectiveness of the method presented in this paper.

Key concepts: Schedule, Visualization, Construction management, Simulation modeling, Engineering, Project management, Tunnel construction, Resource (disambiguation)