Application of Visual Simulation to Optimize Tunnel Schedule Engineering

Zhong Wei, Yang Song

Open publisher page 2 citations

Abstract

The methodology of visual simulation for tunnel engineering construction schedule is presented, visualization of simulation model, calculation and result of construction schedule simulation is realized, the construction simulation of tunnel engineering can be done, the resource optimization of tunnel engineering construction schedule is taken. Meanwhile, risk analysis and decision-making method of tunnel engineering construction schedule based on visual simulation is presented. Furthermore, by using of S curve theory and schedule management method, tunnel engineering construction schedule S curve real time management and control method based on visual simulation is presented; the successful application to the tunnel engineering construction schedule analysis and management demonstrates the feasibility and effectiveness of the method presented in this paper. This electronic document is a "live" template.

About this research paper

What this paper is about

The methodology of visual simulation for tunnel engineering construction schedule is presented, visualization of simulation model, calculation and result of construction schedule simulation is realized, the construction simulation of tunnel engineering can be done, the resource optimization of tunnel engineering construction schedule is taken. Meanwhile, risk analysis and decision-making method of tunnel engineering construction schedule based on visual simulation is presented. Furthermore, by using of S curve theory and schedule management method, tunnel engineering construction schedule S curve real time management and control method based on visual simulation is presented; the successful application to the tunnel engineering construction schedule analysis and management demonstrates the feasibility and effectiveness of the method presented in this paper. This electronic document is a "live" template.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The methodology of visual simulation for tunnel engineering construction schedule is presented, visualization of simulation model, calculation and result of construction schedule simulation is realized, the construction simulation of tunnel engineering can be done, the resource optimization of tunnel engineering construction schedule is taken. Meanwhile, risk analysis and decision-making method of tunnel engineering construction schedule based on visual simulation is presented. Furthermore, by using of S curve theory and schedule management method, tunnel engineering construction schedule S curve real time management and control method based on visual simulation is presented; the successful application to the tunnel engineering construction schedule analysis and management demonstrates the feasibility and effectiveness of the method presented in this paper. This electronic document is a "live" template.

Key concepts: Schedule, Visualization, Computer science, Construction management, Simulation modeling, Resource (disambiguation), Engineering, Civil engineering