Flood forecast and pre-discharge operation is one of the most important flood control methods,which can im-prove flood control ability of reserviors.We defined pre-discharge operation risk through analyzing the possible results of pre-discharge operation with flood forecasting.Incoming runoff random simulation method was established considering flood forecasting error.The method was applied in Wangkuai reservoir and Longmen reservoir in Daqing river basin.Results show that it is very possible that flood control level cannot be restored in time and water supply will be affected for 10-year return flood;while flood pre-discharge operation can improve benefit of flood control obviously for 20-year return flood.

About this research paper

What this paper is about

Flood forecast and pre-discharge operation is one of the most important flood control methods,which can im-prove flood control ability of reserviors.We defined pre-discharge operation risk through analyzing the possible results of pre-discharge operation with flood forecasting.Incoming runoff random simulation method was established considering flood forecasting error.The method was applied in Wangkuai reservoir and Longmen reservoir in Daqing river basin.Results show that it is very possible that flood control level cannot be restored in time and water supply will be affected for 10-year return flood;while flood pre-discharge operation can improve benefit of flood control obviously for 20-year return flood.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Flood forecast and pre-discharge operation is one of the most important flood control methods,which can im-prove flood control ability of reserviors.We defined pre-discharge operation risk through analyzing the possible results of pre-discharge operation with flood forecasting.Incoming runoff random simulation method was established considering flood forecasting error.The method was applied in Wangkuai reservoir and Longmen reservoir in Daqing river basin.Results show that it is very possible that flood control level cannot be restored in time and water supply will be affected for 10-year return flood;while flood pre-discharge operation can improve benefit of flood control obviously for 20-year return flood.

Key concepts: Flood myth, Flood control, 100-year flood, Flood forecasting, Environmental science, Surface runoff, Hydrology (agriculture), Flood prevention

Related papers

Back to paper searchBrowse research topicsOriginal source
Risk Analysis of Flood Forecast and Pre-Discharge Operation of Reservoir — Research Paper | ScholarLens